MSBA Process

The many documents on this page are the result of the submissions the building committee has sent to the MSBA throughout the process. Major milestones in the process are numerated below with links to the reports.

In Spring 2015 the Massachusetts School Building Authority (MSBA) accepted the Statement of Interest (SOI) submitted by PRSD which began the process of working toward a solution to the school facility challenges facing the district. The MSBA has a detailed process leading applicants through a series of rigorous steps which if successful results in a substantial grant toward building construction costs.

1. Statement of Interest

2. Eligibility Period

  • Facilities Maintenance Manual
  •  Capital and Maintenance Report
  • Educational Profile Questionnaire
  • Enrollment Letter
  • Enrollment Projection
  • Enrollment Certification

3. Feasibility Study

  • Preliminary Design Program
  • Preferred Schematic Report

4. Schematic Design – Submission to MSBA on February 20, 2019 (report posted after submission to MSBA)

Footer

Pentucket Regional School District

22 Main Street
West Newbury, MA 01985

Schools

Pentucket Regional High School
24 Main St
West Newbury, MA 01985

Pentucket Regional Middle School
20 Main St
Groveland, MA 01834

  • Facebook
  • Vimeo
  • YouTube

Copyright © 2025 Pentucket Regional School District · Site Design by JGPR